Bringing Command and Control to the Defense Program Office
The three largest U.S. defense contractors are carrying a combined backlog of $557 billion. As demand climbs, cost, margin, and audit exposure sit in the crosshairs of every program. For Chris Morton, Vice President of Industries at IFS, visibility is the ultimate control mechanism, and siloed systems are quietly taking it away. With record backlogs, volatile materials, and relentless oversight squeezing defense margins, the fix starts with a common operating picture, as he explains here.
Every operations center I worked in, whether that was an operations center in Afghanistan or the Joint staff, was built around one screen: the common operating picture. Friendly positions, threat activity, logistics status, weather – all presented in a way to one end – decision advantage. If done right, it was trusted in the room for critical decision-making. Commanders didn’t want to worry about whether the number was right – they wanted to argue about what to do next.
In contrast, walk into most defense manufacturers today, and you’ll find the opposite. Engineering has their view of the program. Procurement another. Finance closes the books and figures out how good the margins were three weeks ago. The program manager sits in the middle – doing their level-best to stitch it all together on Thursday for their Friday program review board. After the weekend, it’s all gone stale, and the cycle begins again.
For defense manufacturing, it’s what you can’t see that eats your margin.
Record demand & thinner margins
Let’s look at the industry backdrop defense manufacturers currently operate in:
- Backlogs are at historic highs. Holding on to the profit inside them is getting harder, and the pressure is coming from all directions at once – program managers are surrounded.
- Contract structure. Defense work runs on a mix of fixed-price and cost-type contracts, and each has their own trap. On fixed-price work, every overrun comes straight out of your margin. For cost-type work, indirect costs (overhead, G&A, fringe) must be allocated, justified, and defended under government accounting rules. Get the rates wrong and you either leave money on the table or hand an auditor a finding.
- Material volatility. 78% of Department of War weapons programs contain components that depend on inputs such as rare earth materials, with the US importing more than 95% of its rare earth elements. On a multi-year program, the price you bid in year one becomes incredible friction in year three.
- In the U.S., DFARS, DCAA, and DCMA each bring their own requirements. The UK has its single source contract regulations, and allies across Europe and Asia-Pacific run their own regimes. Every one of them gets expensive when your data lives in five places.
Where margins leak
Disconnected systems rarely cause just one dramatic failure. The damage is quieter and cumulative:
- Buying the same part three times in small lots because nobody could see combined demand across multiple programs.
- Labor charged to the wrong contract or cost pool, hidden until the audit.
- Finance teams burning weeks on custom reports for the government, the prime, and internal leadership teams, each built on a different report from different spreadsheets.
- A schedule slips because nobody flags the issue until the milestone has arrived or passed.
None of these show up as a cost line item – they show up as margin leakage that looked healthy at bid and ultimately closes at half of what was expected.
Indeed, public records show how hard tracking has become in the modern ecosystem. Only two of the UK’s 49 major defense projects are currently on schedule. Not every delay traces back to systems, but a program you can’t see is a program you can’t steer, and every added tier of subcontractor and funding line makes tracking even more difficult.
The usual pushback: “Our ERP already does project accounting.” Most do, after the fact – but they are nothing more than a history lesson. The real test is whether a system tells you something while there is still time to act on it.
Put the contract at the center
I would submit that the fix is architectural. Make the contract the demand vehicle for the entire system, the hub every other function hangs off.
With the contract at the center, a change in one place triggers action everywhere else. A scope modification flows to engineering, re-plans procurement, updates the labor forecast, and rolls straight up into project margin. Program status becomes something you look at rather than a meeting you schedule.
In practice, a robust project-based ERP built for defense should do four things really well:
- Trace every transaction to the contract. Purchase orders, materials, labor, and overhead, captured at the line level as they happen.
- Forecast margin on actuals. Real prices are real hours, so the estimate at completion reflects today rather than the original bid.
- Produce compliance as a byproduct. DCAA-ready cost reporting, incurred cost submissions, DD250 receiving reports, and electronic invoicing, generated from the same data the program team runs on.
- Give every stakeholder their own view of ONE truth. The program manager, the CFO, the contracting officer, and the prime all see the same numbers – cut the way each of them needs.
I’d be remiss if I didn’t mention the opportunity that AI is bringing to the table. I’ve long argued that AI is really good for things that are dull, data-intensive, and disconnected. If that doesn’t read like a list of a program manager’s daily life, I don’t know what does.
Contracting for defense success
For defense manufacturers, effective project management must serve as the epicenter of business operations and organizational information flow. Having an underlying robust project management system will enable defense manufacturers to navigate the complex requirements of defense contracts and give project managers complete visibility to drive defense project and contract success. This seems obvious, but frankly it sits in the background and focusing on “back office” systems is rarely a place where organizations see as a place to bring value to their companies. Defense manufacturers make money first by winning government contracts. The second is maintaining margins on that contract. The first makes the headlines. The second doesn’t show up until well after the champagne has run dry.
The military has learned this lesson the hard way. Build the common operating picture first, and decisions get faster and better because nobody is busy debating the facts. Backlogs, volatile supply chains, and heavier oversight are not black swan events or “disruption.” They are the norm. Programs you can’t see command you. Instead, program managers need a system that they can command instead.